SMath Studio Forum
»
SMath Studio
»
Bugs & Problems
»
Error: Result is above max allowed positive number
Rank: Newbie
Groups: Registered
Joined: 15/05/2013(UTC) Posts: 5 Location: Brisbane
|
I am getting error "Result is above max allowed positive number". What does that mean and how to resolve it. Edited by moderator 17 May 2013 07:58:40(UTC)
| Reason: Not specified datsnl attached the following image(s):
|
|
|
|
Rank: Administration Groups: Registered, Advanced Member Joined: 23/06/2009(UTC) Posts: 1,740 Was thanked: 318 time(s) in 268 post(s)
|
Attach the SMath file as well, please. |
When Sisyphus climbed to the top of a hill, they said: "Wrong boulder!" |
|
|
|
Rank: Newbie
Groups: Registered
Joined: 15/05/2013(UTC) Posts: 5 Location: Brisbane
|
Hi Omorr,
Thanks for replying.
The file is for the project that I am doing for my organisation and I wont be able to distribute it online (company IP rules).
If you send me your email, I can send it to you as that way privacy can be maintained.
Cheers Dharmit
|
|
|
|
Rank: Administration Groups: Registered, Advanced Member Joined: 23/06/2009(UTC) Posts: 1,740 Was thanked: 318 time(s) in 268 post(s)
|
Hello Dharmit, I understand. Just send me a private e-mail (the last line of any post) or directly to omorr@uns.ac.rs. Before you send it to me, you could just try right click on the regions and choose Optimize|Numeric, or enclose the calculation in eval() - right hand side of the assignment ( := ). This will work most of the time if you just work strictly with the numerical values. Regards, Radovan |
When Sisyphus climbed to the top of a hill, they said: "Wrong boulder!" |
|
|
|
Rank: Newbie
Groups: Registered
Joined: 15/05/2013(UTC) Posts: 5 Location: Brisbane
|
Hi Omorr,
When I right clicked on the region and selected Optimize, it was already selected to Numeric, so I didn't change anything there.
But your eval() worked like a charm.
Thanks for your help. Dharmit
PS: How do I close this thread?
|
|
|
|
Rank: Administration Groups: Registered, Advanced Member Joined: 23/06/2009(UTC) Posts: 1,740 Was thanked: 318 time(s) in 268 post(s)
|
Nice to hear that , I marked this topic as solved. Regards, Radovan EDIT: Unfortunately, I can not explain and I do not know why and when is this happening. This is some internal SMath problem and there is no other way except to use it in these kind of problems. Edited by user 17 May 2013 08:36:50(UTC)
| Reason: Not specified |
When Sisyphus climbed to the top of a hill, they said: "Wrong boulder!" |
|
|
|
SMath Studio Forum
»
SMath Studio
»
Bugs & Problems
»
Error: Result is above max allowed positive number
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.